In a rush of time, Quang Minh Factory Project has run its sprint stage to meet the schedule.

nha may san xuat thuc pham chuc nang IMC (5)

Until the end of June 2015, the project has finished the production area of encapsulation, tableting, coating, blistering and biotechnological products manufacturing. It has been erecting metal fire escape staircase, building the waste water treatment system. It is going to install aluminum and plastic doors, wattles, shutters; to apply epoxy paints on floor and wall, exterior and interior paints of the main building and outbuildings; to partially assemble the central air conditioning systems and many other important items.

IMC tuyển công nhân sản xuất

In the near future, the project has the plans to: move, install and improve the boiler; to construct the steam system around the factory; to install the compressed air system and Reverse Osmosis water filter system.